-
Main Corporate Website
-
XPS
-
Glencore Technology
-
Zipatank
-
Hypersparge
-
IsaKidd
-
IsaMill
-
IsaSmelt
-
JamesonCell
-
Albion Process
-
Viterra
-
Aquarius Energy
-
Glencore in South Africa
-
Glencore in the DRC
-
Mutanda Mining
-
Kamoto Copper Company
-
Astron Energy
-
Katanga Mining Limited
-
Glencore Australia
-
Viterra Australia
-
Bulga Coal
-
Liddell Coal
-
Mangoola
-
McArthur River Mine
-
Mt Owen Complex
-
Ravensworth operations
-
Ulan Coal
-
United Project
-
Wandoan Coal
-
West Wallsend
-
Murrin Murrin
-
Mount Isa Mines
-
Who we are -
What we do -
Main MenuOur operations
-
Our operationsMutanda Mining
-
-
Vacancies
Our mining activity
Our mining operations
Based on its direction, dip, strength, grades and quantities of recoverable minerals and stability, the Mutanda deposit has a remaining mine life of twenty-five years and contains three open pits.
MUMI owns, operates and develops the following mining assets
We mine using fundamental techniques such as fragmentation (drilling and mining), marinating, stockpiling, associated servicing, dewatering, reclamation of haul roads, etc.; followed by processing stages: crushing, grinding and operational transport, leaching and solid/liquid separation, solvent extraction and electroplating.
We also operate an acid plant, cobalt plant, tailings leach unit (CTU4), gravimetric concentration unit (DMS), tailings storage ponds (TSF) and heap leaching facilities.
Given our gradual transition from oxide to sulphide mining, we plan to build sulphide processing facilities.